Search results for: YWCT

HomeSearch Results for "YWCT" Query

Ultimate value proposition with end-to-end coverage CAPPA cooling offers to its clients high-value proposition starting with feasibility studies in relation to cooling requirements, water savings and optimal balance of CAPEX and OPEX. We deliver cooling tower design, manufacturing of cooling towers, delivery including assembly, erection up to commissioning. We can take care of the service […]

Reason behind establishment of the company CAPPA cooling was in the absence of traditional broadly based supplier of modern cooling systems in form of small compact and as well large engineered cooling towers manufactured all from composite materials fulfilling the most stringent criteria and serving clients on all levels in the area of entire Central […]

FRPP MODULAR series YWCT developed a medium size cooling tower (600 m³/hr – 2,000 m³/hr per cooling tower) made of pultruded FRP with integral FRP basin. The cooling tower is delivered to site in modules (sections) which reduces installation time on site to few days instead of weeks. MODULARIZED ON-SITE-ERECTED COOLING TOWERS To download, press […]

YWCT’s experienced engineering team brings you the highest value solution for any cooling tower application. Every solution is custom designed fresh: We make sure our cooling towers meet all required technical specifications, and do so in the most cost-efficient and easy-to-operate fashion. Provide you with CAD drawings in 2-D or 3-D models for every project. […]

CHECK SELECTED REFERENCES BY CLICKING ON LOGOS BELOW

CAPPA cooling offers to its European clients together with the partner company YWCT efficient cooling tower retrofits and replacements. Thanks to high tech engineering and 3D modelling based on analysis of technical documentation, on-site measurements and evaluation we are able to offer replacement of existing field-erected cooling towers in fastest possible way respecting special requirements […]

retrofit your cooling tower to the existing basin

SAVE NEW BASIN’S CONSTRUCTION’S COSTS AND MINIMIZE PRODUCTION’S DOWN TIME! THE RETROFIT ADVANTAGE: YWCT specializes in adjusting field erected cooling towers made of FRP to the existing concrete basin, thereby providing its customers with various advantages: Minimizing production downtime On-site erection of new tower parallel to existing cooling towers’ operation Increasing cooling capacity using the […]