Optimization and delivery of counterflow induced draft field-erected cooling tower with structure from pultruded fibre-reinforced plastic (FRP) for power plant in Czechia as a part of a new cooling circuit project generating savings on water consumption for the end-user along with selection of special equipment reducing the noise level.
Delivery of adiabatic coolers with recirculation for the extension of glass plant in Bulgaria with an aim to reduce the water consumption due to lack of water on site. Industrial pads system selected for adiabatic operation with respect to lower quality of water and easy maintenance.
Delivery of high-efficiency radiator in special execution for installation on a container for cooling of mobile diesel engines at an offshore LNG project in APAC. Design of a unit with strict dimension limits to fit the top of container included separate circuits HT and LT and tank. As cooling fluid used water and glycol.
Pre-assembly of modular cooling towers in workshop in Czechia with transport to a production site in Denmark focused on production of industrial gases. Fast installation of modules of induced draft counter flow FRP cooling tower including integrated modular FRP basin. Challenge by this project was to reduce the erection time on the construction site using the method of off-site manufacturing.
Delivery of 6 units of high-performance dry coolers utilizing oval tube technology for efficient heat exchange along with delivery of turbine cooler for biomass plant in Croatia.